27.4%of construction cost
AustraliaModerate confidenceContext

27.4% of construction cost: Equipment and fuel as a share of the cost of road construction, Australia (2013 survey of road works) (Bureau of Infrastructure, Transport and Regional Economics (BITRE), 2013 to 2016; Australia; moderate confidence).

What it is. 27.4% of the total cost of road construction work: equipment hire and depreciation 21.69% plus fuel 5.76%.

Sample. Survey of road works by the federal transport research bureau, 2013. For private sector contractors alone (36 respondents) equipment and fuel are 27.60% of construction cost (hire and depreciation 21.53%, fuel 6.07%). State and territory road authorities report 27.70% and local governments 26.97%.

What it is not. Context only: how large plant and fuel are in the cost of road construction, 2013 mix, for roads only. It is not an overrun, an hours-over-allowance figure or a measure of standby, and not a share of contract value. Fuel alone is 5.76% of road construction cost, but only 0.79% in the state road authorities' own column and 8.05% in local governments' (Table B2), so it varies with who does the work.

Where it came from

Considered and set aside

context/au_road_construction_equipment_fuel_share · AU · F42 ·the record ·link to this figure ·dispute this figure(or email support@demiton.io)