No published New Zealand figure for hours or labour cost above what the work needed
This figure is outside your filter. Clear the filter.
No published New Zealand figure for hours or labour cost above what the work needed: no defensible figure has been published (New Zealand Infrastructure Commission / Te Waihanga, 2022; New Zealand; low confidence).
What it is. None - New Zealand national sources give industry productivity indices and cost shares, not hours or labour cost against budget on civil jobs.
Sample. Searches: "Stats NZ productivity statistics industry heavy and civil engineering construction labour productivity hours worked"; "Jaffe Le Chappell Motu construction productivity heavy and civil"; "Te Waihanga cost of infrastructure construction cost drivers productivity"; "Labour Productivity in the New Zealand Construction Industry: A Thorough Investigation" (publisher page refused access, so not opened); "New Zealand infrastructure projects cost overruns study". Frequencies and indices that exist but are not costs: civil labour productivity growth of 5% (2022 edition) or 7% (2026 edition) over 2000 to 2020; annual paid hours per worker in construction down about 6% over 2000 to 2020; a Te Waihanga model estimating civil construction prices would be about 10% lower had productivity matched building (a modelled counterfactual on prices, not a share of contract).
What it is not. Recorded as `none` on purpose. Productivity statistics and a labour cost share are not a measure of hours beyond what the work needed, and presenting 22% of cost or a 5% to 7% index as a contractor's overstaffing exposure would be a misreading. No New Zealand source read reports hours or labour cost against budget on civil work.
Where it came from
- New Zealand Infrastructure Commission / Te Waihanga (2022), Economic performance of New Zealand's construction industry · free copyLabour productivity sections, Figures 10 to 12 (pp.16-19); firm profit margins (Figures 16 and 17); Appendix 2 on measuring labour input · source record
Considered and set aside
- New Zealand Infrastructure Commission / Te Waihanga: Gives civil labour productivity growth of 7% from 2000 to 2020 (building construction 21%), an index of output per hour for the industry, not hours over need on a job. Its earlier edition's 5% differs.
- New Zealand Infrastructure Commission / Te Waihanga: Puts direct labour at around 22% of heavy and civil industry costs (the printed table's labour cell is blank). That is the cost base exposed to hours, not an overstaffing or overrun figure.
- Motu Economic and Public Policy Research (for BRANZ): Firm-level productivity growth and dispersion for 2001 to 2012; compares firms with each other, not hours with a budget.
- NZ Institute of Economic Research (NZIER): Sector-wide productivity and competition evidence from 2013; no job-level hours or budgets.
- Atapattu, Domingo & Sutrisna: Estimators' ranking of overrun causes; the abstract names design changes, planning and tender documentation and gives no labour-hours share. Abstract only was read.
- New Zealand Infrastructure Commission / Te Waihanga: One road. It records construction progress rates falling short of the joint venture's plan, with no hours or labour cost figure.
- New Zealand Infrastructure Commission / Te Waihanga: Productivity levels are estimated for vertical (building) construction only, and its labour-share breakdown is Australian data.
- Office of the Auditor-General New Zealand: Audit of one programme's decision-making; it does not break increases into labour, plant or materials.
- New Zealand Government Procurement (MBIE): Contract-form guidance; it contains no labour or productivity figure.