Research / Rework statistics / No published New Zealand figure for the cost of scope and change after work was committed

No published New Zealand figure for the cost of scope and change after work was committed

No figurepublished for this measure
New ZealandScope and changeLow confidenceContractor loss

No published New Zealand figure for the cost of scope and change after work was committed: no defensible figure has been published (Massey University (Asadi, Wilkinson, Rotimi), 2023; New Zealand; low confidence).

What it is. None: New Zealand sources rank change as a cause of rework or cost growth but give no cost, and the one national benchmarking dataset has no New Zealand overrun data.

Sample. Search terms: New Zealand construction variations change orders cost percent of contract value; NZS 3910 rework variation survey; design change cost New Zealand infrastructure; Auditor-General Treasury variations contract value New Zealand; Transmission Gully cost scope change. A frequency or ranking exists but is not a cost: New Zealand estimators name frequent design changes among the three most critical cost factors (Atapattu 2023, abstract only), and Asadi 2023 (80 completed responses) scores changes first among the rework causes the standard contract addresses (Table 3, mean 3.83 of 5), a rating of contract coverage. The Asadi paper quotes rework of up to 25% of contract value from earlier international work.

What it is not. Recorded as none on purpose: no New Zealand source read measures the cost of client or design change, abortive work or change orders that caused rework. Variation values for Australia exist in the corpus but do not apply to New Zealand.